b'NTCA FIVE-STAR SPOTLIGHTThis Oklahoma University Football team locker and training room project challenged Terra-Mar to be done by football season, after other trades took so long. The NTCA Five-Star Contractor ran into pools built wrong, which required the crews to chip out considerable concrete and rebuild. In addition, pools would not hold water, and logos came with unacceptable mounting. But DeGuisti said, Through it all, thanks to our excellent crews, we were done on time, with a job to be proud of.64TileLetter | March 2020'