Page 1 Page 2 Page 3 Page 4 Page 5 Page 6 Page 7 Page 8 Page 9 Page 10 Page 11 Page 12 Page 13 Page 14 Page 15 Page 16 Page 17 Page 18 Page 19 Page 20 Page 21 Page 22 Page 23 Page 24 Page 25 Page 26 Page 27 Page 28 Page 29 Page 30 Page 31 Page 32 Page 33 Page 34 Page 35 Page 36 Page 37 Page 38 Page 39 Page 40 Page 41 Page 42 Page 43 Page 44 Page 45 Page 46 Page 47 Page 48 Page 49 Page 50 Page 51 Page 52 Page 53 Page 54 Page 55 Page 56 Page 57 Page 58 Page 59 Page 60 Page 61 Page 62 Page 63 Page 64 Page 65 Page 66 Page 67 Page 68 Page 69 Page 70 Page 71 Page 72 Page 73 Page 74 Page 75 Page 76 Page 77 Page 78 Page 79 Page 80 Page 81 Page 82 Page 83 Page 84 Page 85 Page 86 Page 87 Page 88 Page 89 Page 90 Page 91 Page 92 Page 93 Page 94 Page 95 Page 9624 2017 | TRENDS LATICRETE INTERNATIONAL. “CoolSprings Galleria has many dedicated mall walkers and, in order to accommodate them,” he explained, “the mall opens its doors at 6:30 a.m. This means an extremely short timeline to complete work during the night.” Harold Waid, division manager, Mid-South region for DAC, agreed with Brooks, noting that while there were many challenges during the project, the main one was “installing the project after hours in a relatively short time frame with no disruption to the mall tenants or shoppers, with all work areas being required to be open to mall traf- fic the next morning.” To accomplish this, he recalled, all tile and setting materials were brought in from an outside storage area each night. “We would prep the floor area and install crack isolation membrane, perform the layout and install tile using a rapid-set thinset, clean the installed tile and work area, prep the edge of the installed tile with transi- tion strips, and remove any leftover material back to the storage area.” Kevin Killian, president of Profast Commercial Flooring, said that on-site project manager Jimmy Roue and head superintendent Tyler Lekki were confident that the company’s experience and expertise would allow them to “finish the installation ahead of schedule.” Working with LATICRETE made the process run smoothly. “The LATICRETE materials were always delivered on time and were very easy to work with,” he said. “The LATICRETE FEATURE STORY (continued) The CoolSprings Galleria project was a two-level mall renovation high- lighted by a full demolition of both upper and lower levels, all receiving new tile. The Profast Commercial Flooring crew installs Shades porcelain tile from Crossville over FRACTURE BAN crack isolation membrane from LATICRETE